i. Eliminate ÔDumsorÕ and achieve sustained and reliable supply of power within a period of six months. ii. Negotiate special credit lines for the supply of Gas and Crude from existing supply sources, to optimize the use of existing thermal generation infrastructure. iii. Review the existing contractual agreements with Independent Power Producers (IPPs), with the view to reducing the burden on government in respect of financial commitments for the utilization of power generated by the IPPs. iv. Review and rationalize the mandates of all statutory agencies and public institutions associated with the development of the energy sector, and consolidate those with overlapping functions. v. Review the Energy Sector Strategy and Transition Plan to respond to current and emerging challenges of the sector, including but not limited to prioritizing the introduction and use of low cost, efficient, and green energy sources, such as Nuclear and Hydrogen power. vi. Introduce Private Sector participation into the power distribution sector, and create regional power distribution enclaves, managed by the Private sector.